The Red Lake Gold Mine is composed of two operating complexes: the Red Lake Complex and the Campbell Complex. Red Lake Gold mine is Canada’s largest gold mine, and in 2007 produced 700,600 ounces. It is also one of the world’s richest gold mines and lowest cost producers. The Campbell Complex has been in continuous operations since 1949, producing over 11 million ounces.
2007 Red Lake Analyst Tour
May 2008 Red Lake Drill Hole Data
Deep Campbell
East Zone
Far East
High Grade Zone
R Zone
Surface
Red Lake Maps November 2007
OPERATING STATISTICS
Red Lake Gold Mine |
2007
(actual) |
| Ore milled Tonnes (000’s) |
721,000 |
| Milled grade Au g/t |
31 |
| Total Recovery Au % |
97 |
| Oz. Produced Au Oz |
700,600 |
| Total Cash Cost US$/oz |
|
Red Lake Gold Mine |
2006
(actual) |
| Ore milled Tonnes (000’s) |
768,900 |
| Milled grade Au g/t |
28 |
| Total Recovery Au % |
97 |
| Oz. Produced Au Oz |
665,600 |
| Total Cash Cost US$/oz |
195 |
Red Lake (100%) |
2005
(actual) |
|
|
Red Lake |
Campbell |
Combined |
|
Ore Milled |
235 |
440 |
675 |
|
Grade |
82 |
15 |
38 |
|
Recovery |
97 |
96 |
96 |
|
Production Oz |
616,000 |
209,200 |
825,200 |
|
Cash Costs |
94 |
312 |
149 |
|
Capex |
57.9 |
12.3 |
70.2 |
Red Lake (100%) |
2004
(actual) |
|
|
Red Lake |
Campbell |
Combined |
|
Ore Milled |
224 |
446 |
670 |
|
Grade |
77 |
15 |
36 |
|
Recovery |
97 |
96 |
96 |
|
Production Oz |
551,900 |
209,000 |
760,900 |
|
Cash Costs |
92 |
276 |
143 |
|
Capex |
49.6 |
11 |
60.6 |
|