TSX: G  C$34.72 0.00    NYSE: GG  US$29.23 0.00
goldcorp inc. goldcorp inc.
Home Careers Legal Info Privacy
Operations Quicklinks
 
Red Lake
Alumbrera
Porcupine
Musselwhite
Wharf
Marigold
El Sauzal
San Dimas
Marlin
- Project Summary
- Location
- Geology
- Mining
- Processing
- Reports
- Sustainability
- The Future
- Exploration
- Contact Info
San Martin
Los Filos
Éléonore
El Limon
Cerro Blanco
Dee JV/South Arturo
Peñasquito
Joint Ventures / Partnerships


Download our Presentation
View our Annual Report
Email Sign Up
Request Info Package

MARLIN

 

MINING

Conventional open pit mining methods using loader/truck operations are employed at the open pit. During 2006, a total of 1,031,585 tonnes of ore was mined at an average grade of 3.7 g/t.

The underground operations use primarily mechanized cut and fill mining methods with underground loading equipment feeding haul trucks. During the reporting period a total of 176,709 tonnes of ore was mined with an average grade of 14.2 g/t gold and 302 g/t silver.