TSX: G  C$24.77 +1.42    NYSE: GG  US$19.03 +0.41
goldcorp inc. goldcorp inc.
Home Careers Legal Info Privacy
Operations Quicklinks
 
Red Lake
Alumbrera
Porcupine
Musselwhite
Wharf
Marigold
- Location
- Geology
- Mining
- Sustainability
- Contact Info
El Sauzal
San Dimas
Marlin
San Martin
Los Filos
Éléonore
El Limon
Cerro Blanco
Dee JV/South Arturo
Peñasquito
Joint Ventures / Partnerships
Strategic Interests


Download our Presentation
View our Annual Report
Email Sign Up
Request Info Package

MARIGOLD

Marigold Mine is a run of mine heap leach operation that commenced production in 1988.  The mine was transformed from a modest, conventional milling operation into a large and extremely efficient heap leach mine.  Exploration led to the discovery of the Millennium ore body in the southern reaches of the property which then led to the Millennium Expansion project. 

Goldcorp has a 66 2/3% interest in the Marigold mine and Barrick holds the remaining 33 1/3% interest.   In 2007, the Company’s share of gold production from the Marigold mine amounted to 93,900 ounces of gold.  Marigold is expected to produce gold through to 2017.

OPERATING STATISTICS

Marigold (100%) 2005
(actual)
2006
(actual)

2007
(actual)

Ore mined tonnes(000's) 5,472 5,778

6,186

Ore Processed tonnes(000's) 5,472 5,779

6,186

Grade Au g/t 0.98 0.74

0.71

Total Recovery Au % 70 70

70

Total Production Au oz 137,100 99,800

93,900

Total Cash Costs US$/oz $216 $304

$575