The El Sauzal Mine is a conventional open pit operation moving nearly 7.4 million tonnes per year of material. Ore is mined at an annual rate of 2.1 million tonnes. Ore is fed through a primary jaw crusher prior to being introduced into a semi-autogeneous grinding mill/ball mill circuit. Gold recovery is a modified CIL circuit. A heap leach pad is currently being constructed of spent ore, dry stack tailings for use in recovering lower grade ore starting in mid-2007.
|