TSX: G $ 27.70 -0.36 -1.28% Volume: 2,736,711 May 24, 2013
NYSE: GG $ 26.83 -0.40 -1.47% Volume: 7,175,808 May 24, 2013
GOLD: US $ 1,386.62 -4.68 -0.34% Volume: May 24, 2013
Unrivalled-Assets

The Marigold operation comprises 11 open pits, eight waste rock stockpiles, three leach pads, two carbon-in-leach processing facilities, and a carbon processing and refining facility. Every day, approximately 146,000 tonnes of ore are produced through standard truck and shovel mining, and approximately 38,000 tonnes of ore are processed as run-of-mine ore stacked on the heap leach pad.