The South Arturo project consists of a series of sediment hosted Carlin-style gold deposits adjacent to and including the former Dee gold mine, 35 kilometres northwest of Elko, Nevada. Goldcorp and Barrick drilled approximately 65,000 metres of mostly infill drilling to improve resource confidence and have initiated scoping level, environmental, engineering and metallurgical studies to provide guidance in the further development of the South Arturo Project as an open pit mine. Exploration drilling continues on other adjacent targets.

For contact information, please visit: www.barrick.com.

TSX: G $ 23.16 -0.01 -0.04% Volume: 1,644,366 March 27, 2015
NYSE: GG $ 18.43 -0.17 -0.91% Volume: 7,367,826 March 27, 2015
GOLD: US $ 1,198.93 -5.37 -0.45% Volume: March 27, 2015
KEY OPERATIONAL FACTS
Location Red Lake, Ontario
Workforce (including contractors) 1,250
Mining type Longhole, Underhand and
Overhand Cut and Fill
Processing method Cyanidation
Power demand 38 MW
Milling/Processing capacity 3,100 tpd
2015 gold production estimate 400,000 - 425,000 oz
GOLD RESERVES
(as of December 31, 2014)  
Proven (oz) 540,000
Probable (oz) 1,520,000
Proven and Probable (oz)* 2,060,000

* Due to rounding, numbers may not add up.

KEY FACTS SUMMARY 2014A 2013A 2012A
Operating data      
Gold produced (oz) 414,400 493,000 507,700
Gold sold (oz) 418,300 487,300 508,300
Ore milled/processed (t) 684,100 768,900 858,100
Gold grade (g/t) 19.47 20.33 19.52
Gold recovery (%) 96% 95% 96%
All-in sustaining costs (US$/oz) $934 $880 $896
Realized gold price (US$/oz) $1,262 $1,400 $1,673
Throughput (tpd) 1,870 2,160 2,380
Mining costs per tonne mined (US$/t moved) $220 $233 $219
Processing costs per tonne milled (US$/t milled) $48 $47 $40
       
Financial data (US$ millions)      
Revenues $529 $684 $852
Depreciation and depletion $116 $107 $83
Earnings from operations $168 $309 $503
Expenditures on mining interests $233 $233 $281
KEY OPERATIONAL FACTS
Location Timmins, Ontario
Workforce (including contractors) 1,110
Mining type Underground
and Stockpiles
Processing method Milling with Gravity
and CIP Recovery
Power demand
27 MW
Milling/Processing capacity 11,000 tpd
2015 gold production estimate 300,000 - 320,000oz
GOLD RESERVES
(as of December 31, 2014)  
Proven (oz) 930,000
Probable (oz) 2,050,000
Proven and Probable (oz)* 2,980,000

* Due to rounding, numbers may not add up.

KEY FACTS SUMMARY 2014A 2013A 2012A
Operating data      
Gold produced (oz) 300,000 291,900 262,800
Gold sold (oz) 299,400 292,000 262,800
Ore milled/processed (t) 4,166,800 4,231,700 4,162,400
Gold grade (g/t) 2.45 2.28 2.12
Gold recovery (%) 92% 94% 93%
All-in sustaining costs (US$/oz) $906 $1,034 $1,146
Realized gold price (US$/oz) $1,262 $1,390 $1,665
Throughput (tpd) 11,420 11,590 11,560
Mining costs per tonne mined (US$/t moved) $114 $121 $140
Processing costs per tonne milled (US$/t milled) $8 $9 $12
       
Financial data (US$ millions)      
Revenues $379 $407 $434
Depreciation and depletion $54 $56 $80
Earnings from operations $92 $163 $132
Expenditures on mining interests $80 $96 $92
KEY OPERATIONAL FACTS
Location Opapamiskan Lake, Ontario
Workforce (including contractors) 770
Mining type Underground
Processing method CIP
Power demand 25 MW
Milling/Processing capacity 4,500 tpd
2015 gold production estimate 250,000 - 270,000oz
GOLD RESERVES
(as of December 31, 2014)   
Proven (oz) 740,000
Probable (oz) 920,000
Proven and Probable (oz)* 1,660,000

* Due to rounding, numbers may not add up.

KEY FACTS SUMMARY 2014A 2013A 2012A
Operating data      
Gold produced (oz) 278,300 256,300 239,200
Gold sold (oz) 279,200 253,700 242,200
Ore milled/processed (t) 1,221,200 1,391,800 1,299,600
Gold grade (g/t) 7.38 5.92 6.03
Gold recovery (%) 96% 96% 96%
All-in sustaining costs (US$/oz) $811 $1,088 $1,223
Realized gold price (US$/oz) $1,265 $1,390 $1,662
Throughput (tpd) 3,350 3,810 3,610
Mining costs per tonne mined (US$/t moved) $78 $78 $79
Processing costs per tonne milled (US$/t milled) $14 $14 $16
       
Financial data (US$ millions)      
Revenues $354 $353 $403
Depreciation and depletion $63 $53 $44
Earnings from operations $111 $101 $161
Expenditures on mining interests $44 $75 $99
KEY OPERATIONAL FACTS
Location Humboldt County,
Nevada
Workforce (including contractors) 355
Estimated mine life (reserves) 16 years
Mining type Open Pit
Processing method Heap Leach
Power demand 4 MW
Milling/Processing capacity 33,000 tpd
2015 gold production estimate n/a
GOLD RESERVES
(as of December 31, 2012)   
Proven (oz) 510,000
Probable (oz) 2,770,000
Proven and Probable (oz)* 3,280,000

* Due to rounding, numbers may not add up.

KEY FACTS SUMMARY 2013A 2012A 2011A
Operating data      
Gold produced (oz) 107,500 96,300 102,500
Gold sold (oz) 107,700 96,000 103,700
Ore milled/processed (t) 10,233,000 7,989,800 8,596,400
Gold grade (g/t) 0.37 0.55 0.58
Gold recovery (%) 73% 73% 73%
All-in sustaining costs (US$/oz) $1,503 $1,282 N/A
Realized gold price (US$/oz) $1,404 $1,66 $1,573
Throughput (tpd) 42,050 33,290 35,820
Mining costs per tonne mined (US$/t moved) $1.92 $1.77 $1.83
Processing costs per tonne leached (US$/t milled) $1.09 $1.36 $1.02
       
Financial data (US$ millions)      
Revenues $151 $160 $163
Depreciation and depletion $21 $17 $19
Earnings from operations $(101) $67 $61
Expenditures on mining interests $62 $45 $25
KEY OPERATIONAL FACTS
Location Lead, South Dakota
Workforce (including contractors) 170
Mining type Open Pit
Processing method Heap Leach
Power demand 2 MW
2015 gold production estimate 85,000 - 90,000oz
GOLD RESERVES
(as if December 31, 2013)   
Proven (oz) 340,000
Probable (oz) 220,000
Proven and Probable (oz)* 560,000

* Due to rounding, numbers may not add up.

KEY FACTS SUMMARY 2013A 2012A 2011A
Operating data      
Gold produced (oz) 56,200 68,100 67,500
Gold sold (oz) 55,500 71,000 64,800
Ore milled/processed (t) 3,158,400 3,185,500 2,890,500
Gold grade (g/t) 0.72 0.77 0.90
Gold recovery (%) 80% 78% 76%
All-in sustaining costs (US$/oz) $1,165 $879 N/A
Realized gold price (US$/oz) $1,383 $1,658 $1,578
Throughput (tpd) 8,650 8,850 8,030
Mining, crushing, pad loading costs per tonne mined (US$/t moved) $3.19 $2.64 $2.72
Leach costs per tonne crushed (US$/t milled) $1.78 $1.50 $1.78
       
Financial data (US$ millions)      
Revenues $78 $125 $109
Depreciation and depletion $4 $3 $3
Earnings from operations $22 $67 $58
Expenditures on mining interests $11 $8 $16
KEY OPERATIONAL FACTS
Location Guatemala
Workforce (including contractors) 3,270
Mining type Open Pit and
Underground
Processing method Crushing, Grinding
and Cyanide Milling
Power demand 17 MW
Milling/Processing capacity 6,000 tpd
2015 gold production estimate 160,000 - 175,000oz
GOLD AND SILVER RESERVES
(as of December 31, 2014)   
Gold Reserves  
Proven (oz) 220,000
Probable (oz) 90,000
Proven and Probable (oz)* 310,000
   
Silver Reserves  
Proven (oz) 12,350,000
Probable (oz) 3,650,000
Proven and Probable (oz)* 16,000,000

* Due to rounding, numbers may not add up.

KEY FACTS SUMMARY 2014A 2013A 2012A
Operating data      
Gold produced (oz) 186,500 202,200 207,300
Gold sold (oz) 183,800 204,600 209,100
Ore milled/processed (t) 1,933,900 1,941,900 1,936,300
Gold grade (g/t) 3.11 3.33 3.44
Gold recovery (%) 97% 96% 96%
All-in sustaining costs (US$/oz) $862 $628 $425
Realized gold price (US$/oz) $1,262 $1,393 $1,658
Throughput (tpd) 5,300 5,320 5,380
Mining costs per tonne mined [open pit] underground (US$/t moved) $74 [$2.92]/$65 [$4.14]/$72
Processing costs per tonne milled (US$/t milled) $26 $27.20 $28.58
       
Financial data (US$ millions)      
Revenues $367 $447 $551
Depreciation and depletion $157 $142 $100
Earnings from operations $(6) $94 $256
Expenditures on mining interests $78 $65 $97
OPERATING STATISTICS
Alumbrera (37.5%) 2014A 2013A 2012A
Tonnes Ore Mined (000's) 6,348 9,544 11,772
Waste Mined tonnes (000's) 15,910 20,682 24,607
Strip ratio waste:ore 2.5 2.2 2.1
Ore Milled tonnes (000's) 13,307 14,014 14,887
Milled Grade Au g/t 0.39 0.37 0.40
Milled Grade Cu % 0.36% 0.37% 0.41%
Total Recovery Au % 70% 70% 71%
Total Recovery Cu % 80% 79% 84%
Total Production Au oz 120,100 117,500 136,600
Total Production Cu lbs (000's) 84,800 90,600 112,200
All-in sustaining costs (US$/oz) $609 $565 $(395)
OPERATING STATISTICS 2005
(actual)
2006
(actual)
2007
(actual)
San Martin      
Ore mined tonnes (000's) 5,200 4,022 2,599
Ore Processed tonnes(000's) 5,198 4,023 2,975
Grade Au g/t 0.68 0.78 0.77
Total Recovery Au % 59% 55% 53%
Total Production Au oz 81,500 59,600 45,300
Total Cash Costs US$/oz $294 $350 $479
KEY OPERATIONAL FACTS
Location Zacatecas, Mexico
Workforce (including contractors) 3,200
Mining type Open Pit
Processing method Flotation
and Grinding
Power demand 147 MW
Milling/Processing capacity 130,000 tpd
2015 gold production estimate 700,000 - 750,000oz

 

KEY FACTS SUMMARY  2014A 2013A 2012A
Operating data    
Gold produced (oz) 567,800 403,800 411,300
Gold sold (oz) 561,700 389,700 399,900
Ore milled/processed (t) 47,286,100 49,233,900 42,361,400
Gold grade (g/t)  0.65 0.45 0.50
Gold recovery (%)  70% 66% 69%
All-in sustaining costs (US$/oz)  $813 $914 $386
Realized gold price (US$/oz)  $1,266 $1,335 $1,693
Throughput (tpd) 109,350  106,200 101,130
Mining costs per tonne mined (US$/t moved)  $2.42 $2.21 $1.74
Processing costs per tonne milled (US$/t milled) $6.76 $7.48 $8.16
     
Financial data (US$ millions)    
Revenues  $1,432 $1,148 $1,588
Depreciation and depletion  $270 $163 $207
Earnings from operations  $218 $(2,270) $640
Expenditures on mining interests  $326 $233 $259
KEY OPERATIONAL FACTS
Location Mezcala, Guerrero, Mexico
Workforce (including contractors) 2,460
Mining type Open Pit
and Underground
Processing method Static Heap
Leaching (Cyanide)
Power demand 13 MW
Milling/Processing capacity 70,000 tpd
2015 gold production estimate 265,000 - 290,000oz
GOLD AND SILVER RESERVES
(as of December 31, 2014) 
Gold reserves
Proven (oz) 1,670,000
Probable (oz) 5,100,000
Proven and Probable (oz)* 6,770,000
   
Silver reserves  
Proven (oz) 8,950,000
Probable (oz) 32,160,000
Proven and Probable (oz)* 41,110,000

* Due to rounding, numbers may not add up.

KEY FACTS SUMMARY 2014A 2013A 2012A
Operating data      
Gold produced (oz) 258,700 332,400 340,400
Gold sold (oz) 257,500 325,900 339,000
Ore milled/processed (t) 23,264,100 27,682,200 29,589,000
Gold grade (g/t) 0.67 0.70 0.69
Gold recovery (%) 49% 49% 48%
All-in sustaining costs (US$/oz) $993 $1,002 $809
Realized gold price (US$/oz) $1,265 $1,396 $1,663
Throughput (tpd) 63,740 77,020 82,190
Mining costs per tonne mined [open pit]  underground (US$/t moved) [$1.73]/$87 [$1.73]/$102 [$1.48]/$95
Processing costs per tonne milled (US$/t milled) $2.32 $2.42 $2.25
       
Financial data (US$ millions)      
Revenues $326 $457 $565
Depreciation and depletion $63 $62 $50
Earnings from operations $57 $189 $325
Expenditures on mining interests $51 $112 $85
KEY OPERATIONAL FACTS
Location Urique, Chihuahua, Mexico
Workforce (including contractors) 495
Mining type Open Pit
Processing method Dynamic Cyanide
Circuit with CIP
Power demand 9 MW
Milling/Processing capacity 6,000 tpd
2015 gold production estimate n/a
Gold reserves
(as of December 31, 2013)   
Proven (oz) 10,000
Probable (oz) 130,000
Proven and Probable (oz)* 150,000

* Due to rounding, numbers may not add up.

KEY FACTS SUMMARY 2013A 2012A 2011A
Operating data      
Gold produced (oz) 80,600 81,800 100,500
Gold sold (oz) 80,800 81,600 100,500
Ore milled/processed (t) 2,247,000 1,992,300 2,075,900
Gold grade (g/t) 1.40 1.36 1.60
Gold recovery (%) 92% 94% 94%
All-in sustaining costs (US$/oz) $628 $425 N/A
Realized gold price (US$/oz) $1,379 $1,666 $1,583
Throughput (tpd) 5,290 5,530 5,770
Mining costs per tonne mined (US$/t moved) $1.95 $1.51 $1.40
Processing costs per tonne milled (US$/t milled) $12.87 $11.82 $10.73
       
Financial data (US$ millions)      
Revenues $113 $137 $160
Depreciation and depletion $32 $35 $43
Earnings from operations $(22) $41 $62
Expenditures on mining interests $1 $9 $11